The Department shall establish a continuing planning process consistent with all applicable federal requirements which results in plans for all waters of the State and includes:
- 1. Adequate effluent limitations and schedules of compliance;
- 2. The incorporation of all elements of any applicable areawide plans for management of waste and plans for basins under NRS 445A.300 to 445A.730, inclusive;
- 3. Total maximum daily load for pollutants and contaminants;
- 4. Procedures for revision of the plans;
- 5. Adequate authority for intergovernmental cooperation;
- 6. Adequate implementation, including schedules of compliance, for revised or new standards of water quality;
- 7. Controls over the disposition of all residual waste from any treatment of water;
- 8. An inventory and ranking, in order of priority, of needs for construction of treatment works; and
- 9. Controls over the injection of fluids through a well to prevent the degradation of underground water.
(Added to NRS by 1973, 1713; A 1985, 767)