N.M. Code R. § 20.6.7.30
A. Exceedance of ground water standards. If monitoring of a water contaminant source indicates that applicable standards are exceeded, or if the extent or magnitude of existing ground water contamination is significantly increasing, the permittee shall collect a confirmatory sample from the monitoring location(s) within 15 days to confirm the initial sampling results, unless the permittee elects to accept the initial sampling results as an accurate measurement of water quality. Within 30 days of the confirmation of the exceedance of applicable standards or significant increases in existing contamination, the permittee shall take the following actions. The department may approve a longer time period not to exceed 90 days for good cause shown.
(1) A corrective action plan shall be submitted to the department for approval. The corrective action plan shall describe any repairs made or proposed to address the cause of the exceedance or increase and shall propose source control measures and a schedule for implementation. The department shall approve or disapprove the corrective action plan within 60 days of receipt. Following the department’s approval of the corrective action plan, the permittee shall initiate implementation of the plan according to the approved schedule. If the department does not approve the corrective action plan, the department shall notify the permittee of the deficiencies by certified mail. The permittee shall submit a revised corrective action plan to the department within 60 days of the date of postal notice of the notice of deficiency. The department shall approve or disapprove the revised corrective action plan within 60 days of receipt.
(2) If the corrective action plan proposes actions to correct deficiencies with a liner, the proposed actions shall include repair or replacement of the existing liner, or construction and lining of a new impoundment. If liner repair is practicable, repairs shall be made pursuant to 20.6.7.17 NMAC or using a material that is equivalent to the existing liner with respect to material thickness and composition. Repairs shall be completed in accordance with the approved schedule. If liner repair is not practicable, the corrective action plan shall propose reconstruction and relining of the impoundment pursuant to 20.6.7.17 NMAC or construction and lining of a new impoundment pursuant to 20.6.7.17 NMAC. Reconstruction or construction plans and specifications for the impoundment shall be completed pursuant to 20.6.7.17 NMAC and submitted with the corrective action plan along with a schedule for implementation. If a new impoundment is constructed the existing impoundment shall be closed pursuant to 20.6.7.33 NMAC.
(3) The permittee may be required to submit to the department for approval an abatement plan, which includes a site investigation to define the source, nature and extent of contamination; a proposed abatement option, and a schedule for its implementation. The site investigation and abatement option shall be consistent with the requirements and provisions of Sections 20.6.2.4101, 20.6.2.4103, 20.6.2.4106, 20.6.2.4107, 20.6.2.4108 and 20.6.2.4112 NMAC.
(4) A corrective action plan or abatement plan approved or submitted prior to the date of the copper mine rule shall satisfy the requirements of this subsection provided that any substantial change in monitoring results after the effective date of the copper mine rule may require additional corrective action under this Subsection or modification of a previously approved or submitted corrective action plan or abatement plan.
[20.6.7.30 NMAC - N, 12/1/13]