N.M. Code R. § 20.6.2.5204
B. Prior to well injection and at least once every five years or more frequently as the secretary may require for good cause during the life of the well, the discharger must demonstrate that a Class I well or Class III well has mechanical integrity. The demonstration shall be made through use of the following tests:
(1) for evaluation of leaks:
(2) for determination of conduits for fluid movement:
D. In conducting and evaluating the tests enumerated in this section or others to be allowed by the secretary, the discharger and the secretary shall apply methods and standards generally accepted in the affected industry. When the discharger reports the results of mechanical integrity tests to the secretary, he shall include a description of the test(s), the method(s) used, and the test results. In making an evaluation, the secretary's review shall include monitoring and other test data submitted since the previous evaluation.
[9-20-82, 12-1-95; 20.6.2.5204 NMAC - Rn, 20 NMAC 6.2.V.5204, 1-15-01; A, 12-1-01; A, 8-31-15]