N.M. Code R. § 19.8.20.2068
PUBLIC NOTICE: The mining schedule shall be distributed by mail to all owners of property and residents residing within the permit area above the underground workings and adjacent areas. Each such person shall be notified by mail at least six months prior to mining beneath his property or residence. The notification shall contain, at a minimum:
C. the location or locations where the operator's subsidence control plan may be examined.
[11-29-97; 19.8.20.2068 NMAC - Rn, 19 NMAC 8.2.20.2068, 9-29-2000; A, 12-31-2007]