N.M. Code R. § 19.8.20.2029
PRE-BLASTING SURVEY:
E. Any surveys requested more than 10 days before the planned initiation of blasting shall be completed by the operator before the initiation of blasting.
[11-29-97; 19.8.20.2029 NMAC - Rn, 19 NMAC 8.2.20.2029, 9-29-2000]