N.M. Code R. § 19.8.20.2019
PROTECTION OF GROUND WATER RECHARGE CAPACITY: Surface mining activities shall be conducted in a manner that facilitates reclamation which will restore approximate premining recharge capacity, through restoration of the capability of the reclaimed areas as a whole, excluding coal processing waste and underground development waste disposal areas and fills, to transmit water to the ground water system. The recharge capacity shall be restored to a condition which:
C. provides a rate of recharge that approximates the premining recharge rate.
[11-29-97; 19.8.20.2019 NMAC - Rn, 19 NMAC 8.2.20.2019, 9-29-2000; A, 12-31-2007]