N.M. Code R. § 19.8.20.2005
REMOVAL:
E. Topsoil substitutes and supplements.
(1) Selected overburden materials may be substituted for or used as a supplement to topsoil, if the director determines that the resulting soil medium is equal to or more suitable for sustaining vegetation than is the available topsoil and the substitute material is the best available to support vegetation. This determination shall be based on:
(a) the results of chemical and physical analyses of overburden and topsoil. These analyses shall include determinations of pH, net acidity or alkalinity, available phosphorus and potassium, texture class and other analyses as required by the director. The director may also require that results of field-site trials or greenhouse tests be used to demonstrate the feasibility of using these overburden materials.
(b) Methodologies and results of analyses, trials or tests which demonstrate that the proposed substitute material is equal to or more suitable for reclamation and revegetation than is the available topsoil shall be certified by a qualified professional and shall be submitted to the director.
(2) Substituted or supplemental material shall be removed, segregated, and replaced in compliance with the requirements for topsoil under 19.8.20 NMAC.
F. Limits on topsoil removal area. Where the removal of vegetative material, topsoil, or other materials may result in accelerated erosion which may cause air or water pollution:
(1) The size of the area from which topsoil is removed at any one time shall be limited.
(2) The topdressing shall be distributed at a time when the physical and chemical properties of the topdressing can be protected and erosion can be minimized; and
(3) Such other measures shall be taken as the director may approve or require to control erosion.
G. If it is demonstrated to the director that it is technologically infeasible to remove topsoil or topsoil substitutes from particular slopes without endangering equipment operators or without mixing unsuitable material with such topsoil or topsoil substitutes, segregation and utilization of such material shall not be required.
[11-29-97; 19.8.20.2005 NMAC - Rn, 19 NMAC 8.2.20.2005, 9-29-2000]