N.M. Code R. § 19.27.1.20
As soon as practicable after completing the well and the application of water to the intended use pursuant to the permit, the applicant shall have prepared and file a "final inspection and report" in triplicate on forms provided by the state engineer. The final report shall be accompanied by a plat prepared in accordance with Article 5 [now 19.25.3 NMAC]. The final inspection and report shall be prepared by a registered professional engineer and land surveyor or by a registered land surveyor as specified by the state engineer.
[SE-66-1 Article 1-13, Recompiled 12/31/01]