19.2.5.11
USE OF NECESSARILY DISTURBED CALICHE FROM OIL AND GAS LEASE ACREAGE. The commissioner shall make no charge for caliche necessarily moved within the roadbed or within the perimeter of a specific well pad while in the process of developing oil and natural gas under a state oil and gas lease, subject to the following conditions.
- A. Only caliche derived from the cellar and reserve pit or cut and fill, which is necessarily disturbed in the process of building an access road and/or that oil and gas well location, may be used without charge.
- B. Caliche necessarily disturbed during construction must remain within the boundaries of the oil and gas lease. If excess caliche exists from a necessary disturbance, that caliche may only be moved from that location to another well site within the lease once an operator or lessee of record obtains a permit and compensates the commissioner pursuant to the terms of a community caliche pit permit.
C. Only caliche excavated during cut and fill construction of a well pad or roads built to 19.2.20 NMAC standards will be considered necessarily disturbed.
[5/14/1999; 19.2.5.11 NMAC - Rn, 19 NMAC 3. SLO 5.11, 9/30/2002]