N.M. Code R. § 19.15.13.11
Proposal by pooled working interest owner:
B. The operator shall, within 60 days after receipt of such notice, either propose an infill well at the specified location and depth as an operator proposal pursuant to 19.15.13.10 NMAC, or notify the owner proposing the well that it declines to do so.
(1) If the operator proposes the well and fewer than all working interest owners elect to participate, the operator may withdraw the proposal unless the originally proposing owner, within 30 days of receipt of notice of such occurrence, advances the share of estimated well costs allocable to all non-consenting owners of pooled working interests.
(2) If the operator proposes the well and all owners consent to the well or the originally proposing owner advances the share of well costs allocable to an otherwise unsubscribed interest, the operator shall commence drilling the proposed infill well within 120 days after it receives notice that either condition has occurred. The director may extend the time for commencement of drilling once for not more than an additional 120 days, upon showing of good cause for the extension, without notice or hearing. Well costs applicable to a non-consenting owner of a pooled working interest, together with the risk charge provided in the original pooling order, shall be recoverable out of the non-consenting owner’s share of production as in other cases.
[19.15.13.11 NMAC - Rp, 19.15.1.36 NMAC, 12/1/08]