- A. The contents of the application specifically identified by the division shall become terms and conditions of the permit or permit modification.
B. The division shall, as appropriate, specify conditions upon a permit, including:
- (1) placement of geothermal wells in accordance with the location limitations in 19.11.4.8 NMAC;
- (2) financial assurance requirements in accordance with 19.11.2.18 NMAC;
- (3) well-construction in accordance with 19.11.4.10 NMAC;
- (4) blowout prevention requirements in accordance with 19.11.4.11 NMAC;
- (5) operating limitations in accordance with 19.11.4.12 NMAC;
- (6) testing and monitoring requirements in accordance with 19.11.4.13 NMAC;
- (7) recordkeeping and reporting requirements in accordance with 19.11.4.14 NMAC;
- (8) surface facility requirements in accordance with 19.11.4.15 NMAC;
- (9) abandonment requirements in accordance with 19.11.4.16 NMAC;
- (10) pit design, construction and operating plan and closure remediation plan requirements in accordance with 19.11.4.17 NMAC;
(11) disposal requirements in accordance with 19.11.4.20 NMAC; and
- (12) other operational requirements, including additional testing, monitoring, recordkeeping and reporting or construction requirements deemed necessary to protect life, health, correlative rights, property, natural resources, the environment or the public welfare.
- C. Any term or condition imposed by the division on a permit or permit modification is enforceable to the same extent as a rule.
- D. The permit term for all permits shall not exceed 10 years.
[19.11.2.15 NMAC - N, 2/27/2018]