- A. Based on the dimensions of a vehicle, combination or load or the route requested, the DOT may require that a route survey be conducted and submitted to the DOT prior to issuance of a special permit. When a route survey is required, it shall be carried in the permitted vehicle at all times during the move.
- B. A route survey is valid for a period of fourteen days but is subject to change by the DOT at any time depending on circumstances, including inclement weather, highway construction, utility work, roadway design, and traffic patterns.
- C. The DOT may extend the validity period of a route survey at its discretion for carriers engaged in moving the same dimensions or in moving similar loads where there are no structural clearance issues.
- D. A route survey shall be in a written form approved by the DOT.
[18.19.8.30 NMAC - N, 2/12/2016; A, 6/1/2022]