- A. Permits required for medical gas and vacuum systems shall be pursuant to 14.5.2 NMAC.
- B. Plans and document submittals for medical gas and vacuum systems shall be pursuant to 14.5.2.10 NMAC.
C. Inspections for medical gas and vacuum piping systems shall be as follows:
- (1) State and local buildings inspectors shall inspect medical gas and vacuum systems pursuant to Chapter 13 of the current adopted NMPC and Subsection E of 14.5.3.9 NMAC.
- (2) No state or local building inspector shall issue a final inspection for a medical gas and vacuum system project, without first receiving proper and complete documentation from the medical gas and vacuum system verifier.
- (3) If there is a dispute regarding code compliance between a medical gas and vacuum system verifier and a state or local inspector, the mechanical-plumbing bureau chief of the construction industries division shall make the final determination. The mechanical-plumbing bureau chief is the ultimate authority for interpretation of the current New Mexico adopted codes.
[14.9.5.14 NMAC - Rp, 14.9.5.12 NMAC, 11/15/2019]