See this chapter of the IEBC except as provided below.
- A. Section 701 General. See this section of the IEBC.
- B. Section 702 Building Elements and Materials. See this section of the IEBC except make the following change to Section 702.7 Materials and methods. Delete the text of this section of the IEBC and substitute: all new work shall comply with materials and methods requirements in the New Mexico construction codes (See Subsection L of 14.5.1.7 NMAC).
[14.7.7.15 NMAC - Rp, 14.7.7.15 NMAC, 7/14/2023]