- (a) A person constructing a bedrock well shall complete a “Well Completion Report” and submit the well completion report to the board in accordance with We 801.
(b) A person constructing a bedrock well shall observe and record the following information:
- (1) Types of unconsolidated materials overlying the bedrock and the thickness of the layers;
- (2) Characteristics of the bedrock and noticeable changes in bedrock and depths at which changes occur;
- (3) Depths to fractures yielding readily observable amounts of water;
- (4) Depth to static water level prior to pump installation; and
(5) Special circumstances encountered in the construction of the well including but not limited to:
- a. Soft bedrock;
- b. Caving conditions; or
- c. Turbid or cloudy water.
Source. (See Revision Note at chapter heading for We 600) #12083 eff 3-1-17