(a) Subject to (b), below, for wells that are required to have grouted well casings, as specified in We 602.14, We 602.16, We 602.22, and We 602.25, the following construction methods shall be used:
(1) The void area outside the well casing shall be filled with:
(2) For bedrock wells:
i. Grout shall be pumped through a tremie pipe inserted on the outside of the casing to the bottom of the pilot hole while the pipe is raised in a continuous operation, as the void area is filled, to the ground surface; or
ii. The casing shall be secured approximately 12 inches above the bottom of a pilot hole, drilled into bedrock, and grout shall be pumped into the casing with sufficient pressure to force the grout out of the bottom of the casing into the void area outside of the casing and to fill the annulus from the bottom up to the ground surface; and
(b) This section shall not apply to: