If a municipality is in immediate need of bridge construction or reconstruction as a result of an emergency, the bureau shall waive the consultant selection process if the municipality:
- (a) Has municipal staff qualified to provide the services; or
- (b) Has in place a contract for services, reached through a process complying with RSA 21-I:22, with a firm qualified to provide the required design services, provided that all firms that competed for selection to provide those services were qualified to provide the required design services.
Source. #8923, eff 6-27-07; ss by #11037, eff 2-22-16