N.H. Code Admin. R. Saf-C 3306.02
Required Documents
Effective Mar 8, 2019#5439, eff 7-24-92; ss by #6810, INTERIM, eff 7-25-98, EXPIRES: 11-22-98; ss by #6885, eff 11-18-98;ss by #8741, INTERIM, eff 11-18-06, EXPIRED: 5-17-07 New. #9752, eff 7-9-10; ss by #12737, eff 3-8-19Commissioner, Department of Safety
- (a) All documents submitted with the application shall be identified to indicate the manufacturer's name, location of the approved state label(s), and the location of the manufacturer’s data plate.
- (b) Structural connections and connection of systems, equipment and appliances to be performed on-site shall be identified, detailed, and distinguished from work to be performed in the manufacturing facility.
- (c) The method of interconnection between modular buildings and building components and location of connections shall be identified.
- (d) Design calculations and test reports shall be submitted with the application.
- (e) Drawings shall be dated and identified. An index shall be included which shall be used to determine that the package is complete.
(f) Documents shall include the following:
- (1) Use and occupancy;
- (2) Area;
- (3) Height and number of stories;
- (4) Type of construction;
- (5) Floor, wind, snow, and seismic loads;
- (6) Year and type of code references; and
- (7) Any state code amendments.
- (g) All documents hall have a seal from a New Hampshire licensed architect when required by RSA 310-A:52, and a seal from a New Hampshire licensed professional engineer when an architect’s seal is required.
Source. #5439, eff 7-24-92; ss by #6810, INTERIM, eff 7-25-98, EXPIRES: 11-22-98; ss by #6885, eff 11-18-98;ss by #8741, INTERIM, eff 11-18-06, EXPIRED: 5-17-07 New. #9752, eff 7-9-10; ss by #12737, eff 3-8-19