N.H. Code Admin. R. Saf-C 1629.03
Building Requirements
Effective Aug 15, 2013#2220, eff 12-31-82; ss by #2837, eff 8-27-84; ss by #4584, eff 3-3-89; ss by #5996, INTERIM, eff 3-3-95, EXPIRES, 7-1-95; ss by #6054, eff 7-1-95, EXPIRED: 7-1-03 New. #8116, INTERIM, eff 7-14-04, EXPIRES: 1-10-05; ss by #8231, eff 12-20-04; ss by #10396, eff 8-15-13Commissioner, Department of Safety
- (a) The building or other facility used for mixing blasting agents, shall be well ventilated.
- (b) Heating units which do not depend on combustion processes, when properly designed and located, may be used in the building. All direct sources of heat shall be provided exclusively from units located outside the mixing building.
- (c) Buildings used for the mixing of blasting agents shall conform to the requirements of this section.
- (d) Buildings shall be of noncombustible construction or sheet metal on wood studs.
- (e) Floors in a mixing plant shall be of concrete or of other nonabsorbent materials.
Source. #2220, eff 12-31-82; ss by #2837, eff 8-27-84; ss by #4584, eff 3-3-89; ss by #5996, INTERIM, eff 3-3-95, EXPIRES, 7-1-95; ss by #6054, eff 7-1-95, EXPIRED: 7-1-03 New. #8116, INTERIM, eff 7-14-04, EXPIRES: 1-10-05; ss by #8231, eff 12-20-04; ss by #10396, eff 8-15-13