N.H. Code Admin. R. Puc 908.01
Emergencies and Maintenance
Effective Sep 14, 2020#7424, eff 1-12-01; ss by #9353, INTERIM, eff 1-12-09, EXPIRED: 7-11-09 New. #9515, eff 7-18-09; ss by #9998, eff 9-20-11; ss by #13080, eff 9-14-20Public Utilities Commission
- (a) The customer-generator shall, during the period it operates as a customer-generator, provide to the distribution utility a current telephone number(s) at which the customer-generator shall be contacted.
- (b) The distribution utility shall make arrangements for routine utility repairs or inspections that might involve the net-metered facility during normal business hours.
- (c) The customer-generator shall not export electricity to the electric distribution system during any outages of the distribution system that serves the customer-generator.
- (d) The customer-generator’s net-metered facility may be operated during outages referred to in (c) above only with an open tie to the distribution utility.
(e) The customer-generator’s net-metered facility shall not:
- (1) Create an islanding situation on the electric distribution system; or
- (2) Energize a de-energized utility circuit for any reason.
Source. #7424, eff 1-12-01; ss by #9353, INTERIM, eff 1-12-09, EXPIRED: 7-11-09 New. #9515, eff 7-18-09; ss by #9998, eff 9-20-11; ss by #13080, eff 9-14-20