(a) When an operator marks its underground facility it shall indicate:
- (1) The width of the underground facility for all facilities greater than 1 inch nominal diameter;
- (2) The specific owner or operator of the underground facility; and
- (3) The function of the underground facility.
(b) For purposes of Puc 806.03 (a)(3) functions shall be marked by using:
- (1) The letter E for underground facilities conveying electricity;
- (2) The letter G for underground facilities conveying gas;
- (3) The letters PP for underground facilities conveying oil;
- (4) The letters ST for underground facilities conveying steam;
- (5) The letters CH for underground facilities conveying chemicals;
- (6) The letter T for underground facilities containing telephone wires or cable;
- (7) The letters CATV for underground facilities conveying cable television signals;
- (8) The letters TC for underground facilities conveying traffic control information or signals;
- (9) The letters FA for underground facilities conveying fire alarm information or signals;
- (10) The letter W for underground facilities conveying water;
- (11) The letters RW for underground facilities conveying reclaimed water;
- (12) The letter S for underground facilities conveying sewage;
- (13) The letters SS for underground facilities conveying storm sewage; and
- (14) The letters SD shall be used for underground facilities used for storm drainage.
- (c) An operator shall identify with markings any changes in direction or terminations occurring within the immediate area of the proposed excavation with arrows or other appropriate indicators.
Source. #7350, eff 8-23-00; ss by #7900, eff 5-29-03; ss by #9318, eff 11-8-08; ss by #12102, eff 2-8-17