N.H. Code Admin. R. Puc 3002.05
“City gate” means the interconnection between a delivering pipeline and the distribution system of an LDC.
Source. #7811, eff 12-28-02; ss by #9796-A, eff 9-25-10; ss by #12757, eff 6-1-19 (from Puc 3002.04)