N.H. Code Admin. R. Puc 1403.02
(a) Any owner or operator of a pipeline facility regulated by the Federal Energy Regulatory Commission shall, with respect to any such pipeline facility located or to be located in New Hampshire, file with the commission:
(2) Concurrently upon its filing with the Federal Energy Regulatory Commission, a copy of any application for a certification of public convenience and necessity under the Natural Gas Act, 15 U.S.C. § 717f(c), with respect to any pipeline facility proposed to be located in New Hampshire.
Source. #6445, eff 1-28-97 (formerly Puc 1401.01); ss by #8245, eff 12-31-04; ss by #10343, eff 5-22-13
Appendix
Puc 1401
RSA 365:8, XII
Puc 1402
RSA 365:8, XII; RSA 374:15
Puc 1403.01
RSA 365:8, V and XII; RSA 374:15
Puc 1403.02
RSA 365:8, V and XII; RSAs 374:15
Appendix B
DOCUMENTS INCORPORATED BY REFERENCE
FEDERAL STANDARDS AND FORMS
• Federal Energy Regulatory Commission Forms:
Form Number 2 – Major Natural Gas Pipeline Annual Report (Puc 1403.02(a)(1))
Form Number 2A – Non-Major Natural Gas Pipeline Annual Report (Puc 1403.02(a)(1))
Available for downloading at no charge at: http://www.ferc.gov/docs-filing/forms.asp