N.H. Code Admin. R. Pas 305.01
Requirements for Manufacturers to Pre-Certify Tows, Carousels, and Conveyors
Effective Aug 6, 2022#2297, eff 2-7-83; ss by #2704, eff 5-9-84, EXPIRED 5-9-90 (formerly Saf-S 1005.01) New. #4862, eff 7-10-90; amd by #6020, eff 4-14-95; ss by #6284, eff 7-10-96; ss by #7800, eff 12-11-02, EXPIRED: 12-11-10 New. #10072, eff 1-11-12; ss by #12989, eff 2-5-20; ss by #13429-B, eff 8-6-22 (see Revision Note #2 at chapter heading for Pass 300)Passenger Tramway Safety Board
- (a) The manufacturer shall submit the appropriate application form listed below. When completing the application form for pre-certification purposes, the manufacturer shall indicate “pre-certification” in lieu of site specific information.
- (b) For a rope tow, a manufacturer shall request pre-certification by submitting a completed form Pas 1 “Application for New Construction, Alteration in Length, Relocation, or Modification and Registration of Fiber Rope Tow or Wire Rope Tow”, as revised 1/2022.
- (c) For a conveyor or carousel, a manufacturer shall request pre-certification by submitting a completed form Pas 2 “Application for New Construction, Alteration in Length, Relocation, or Modification and Registration of Conveyor or Carousel”, as revised 1/2022.
- (d) For pre-certification of tows, carousels, and conveyors, the design shall be suitable for installation at any location without modification of any structures, electrical system, mechanical system or hydraulic system.
- (e) Installation procedures shall be the same for all sites except for the length or number of carriers that might vary at different locations.
Source. #2297, eff 2-7-83; ss by #2704, eff 5-9-84, EXPIRED 5-9-90 (formerly Saf-S 1005.01) New. #4862, eff 7-10-90; amd by #6020, eff 4-14-95; ss by #6284, eff 7-10-96; ss by #7800, eff 12-11-02, EXPIRED: 12-11-10 New. #10072, eff 1-11-12; ss by #12989, eff 2-5-20; ss by #13429-B, eff 8-6-22 (see Revision Note #2 at chapter heading for Pass 300)