- (a) The passenger tramway safety bureau shall be authorized to perform an inspection of any tramway in order to determine compliance with the rules, regulations, and codes of the department or the board.
- (b) The findings of inspections conducted by the passenger tramway safety bureau shall be recorded on form Pas 7 “Passenger Tramway Safety Bureau Inspection Report” , revised 01/2022.
- (c) If an inspection results in any failure to comply with the rules, regulations, or codes of the department or the board, the inspector shall list the failures and the recommended corrective measures required for compliance on the Pas 7 form.
- (d) The area operator of the tramway shall sign the completed Pas 7 form to certify receipt of a copy and shall reply in writing to the passenger tramway safety bureau within 10 days, unless specified otherwise, that the failures have been corrected as prescribed by the inspector.
- (e) Pursuant to RSA 225-A:10-a, prior to the construction of a new, or the alteration of an existing, passenger tramway, the operator or prospective operator shall submit plans and specifications to the department so that the department may make recommendations relative to the safety of the layout and equipment.
Source. #13429-B, eff 8-6-22