N.H. Code Admin. R. He-P 4044.07
Shielding and Safety Design Requirements
Effective Jul 1, 2025#6827, eff 8-6-98; ss by #8692, INTERIM, eff 7-27-06, EXPIRES: 2-2-07; ss by #8808, eff 1-24-07; ss by #10804, eff 3-26-15; ss by #14302, eff 7-1-25, EXPIRES: 7-1-35Former Division of Public Health Services
- (a) A qualified expert, registered with DHHS/RHS, pursuant to He-P 4040.06, shall be consulted in the design of a particle accelerator installation and called upon to perform a radiation survey when the accelerator is first capable of producing radiation.
- (b) Each particle accelerator installation shall be provided with such primary and secondary barriers as are as necessary to assure compliance with He-P 4020.05 and He-P 4020.13.
Source. #6827, eff 8-6-98; ss by #8692, INTERIM, eff 7-27-06, EXPIRES: 2-2-07; ss by #8808, eff 1-24-07; ss by #10804, eff 3-26-15; ss by #14302, eff 7-1-25, EXPIRES: 7-1-35