- (a) Existing rip-rap may be maintained in-kind, repaired in-kind, or replaced in-kind as a minimum impact tidal shoreline stabilization project only if the work meets the requirements of Env-Wt 609.10.
(b) The applicant shall provide the following with or as part of an application for any work that does not qualify under Env-Wt 609.10:
- (1) A signed certification that the rip-rap that is the subject of the work is an existing legal structure; and
- (2) The design information specified in Env-Wt 609.07(b)(2)-(6).
Source. #12806, eff 12-15-19