- (a) Where not already exempt under RSA 482-A:3, IV, maintenance dredging associated with existing infrastructure, a previously constructed maintenance dredge project, or an active man-made pond, shall be a minimum impact project provided the proposed dredging of public waters does not exceed 20 CY and impacts less than 10,000 SF of wetland.
(b) A dredging project shall be a minor impact project if it otherwise meets the minimum impact criteria but:
- (1) The area to be dredged will exceed the previously-permitted dredge area;
- (2) The wetland-impacted dredge area is less than 10,000 SF in area;
- (3) There are aquatic resource impacts based on time-of-year restrictions that require NHF&G authorization; or
- (4) For public waters, the proposed dredging will be 20 CY or greater but no more than 30 CY.
(c) A dredging project shall be a major impact project if it:
- (1) Is a new or unmaintained dredging project;
- (2) Will have 10,000 SF or greater of wetlands impacts;
- (3) Will dredge more than 30 CY in public waters; or
- (4) Will be located in a PRA, except as provided in Env-Wt 407.
Source. #12805, eff 12-15-19; amd by #13124, eff 10-23-20