- (a) Docking structures shall be constructed or installed in accordance with the approved plans and specifications.
(b) All seasonal docking structures shall be:
- (1) Installed after ice-out and removed prior to ice-in if on a lake or pond;
- (2) Installed after May 15 and removed prior to November 15 if on a watercourse;
- (3) Placed in the water in a way that does not obstruct navigation; and
- (4) Removed from the water prior to applying any paint, stain, or other preservative coating, and not returned to the water until after such coating is dry.
- (c) If a permanent docking structure is not maintained so as to be usable for its intended purpose, the owner of the subject property shall remove the docking structure.
Source. #12805, eff 12-15-19; ss by #12976, ss by #13124, eff 10-23-20; ss by #13776, eff 10-13-23