In addition to meeting all applicable construction standards established in Env-Wt 300, the following shall apply to water access structure projects:
- (a) The water access structure shall be constructed as shown in the approved plans and specifications;
(b) Revegetation of the disturbed area by planting trees, shrubs, and ground covers shall:
- (1) Represent the density and species diversity of the existing stand of vegetation removed for the project; and
- (2) Begin at a distance no greater than 5 feet landward from the water access structure’s footprint; and
- (c) Appropriate methods for the diversion of stormwater away from the beach and deck shall be installed immediately upslope of the structure.
Source. #12805, eff 12-15-19