N.H. Code Admin. R. Env-Wr 402.02
Content of Application
Effective May 24, 2024#1716, eff 2-20-81; ss by #2207, eff 12-13-82; ss by #2900, eff 11-7-84, EXPIRED 11-7-90 New. #5080, eff 2-22-91; ss by #6462-B, eff 2-21-97; ss by #8285, INTERIM, eff 2-21-05, EXPIRES: 8-20-05; ss by #8414, eff 8-20-05; ss by #10510, eff 1-22-14; ss by #13980, eff 5-24-24Dam-Related Programs
(a) The applicant shall provide the following information with the application form required in Env-Wr 402.01(a) above:
- (1) A statement that the owner has legal flowage rights on all lands which will be permanently or temporarily flooded by the dam and whether those rights are fee simple ownership, a flowage easement, prescriptive rights, or mill privileges;
- (2) The volume and page number of the deed for the property on which the dam is or is proposed to be located and, for an existing dam that was conveyed separately from the property, the volume and page number of the deed for the dam;
- (3) A description of the specific location of the existing or proposed dam;
- (4) The corresponding permit application number or permit number pursuant to RSA 482-A, if applicable;
- (5) The size of the drainage area, normal pond area, maximum pond area, normal storage capacity, and maximum storage capacity of the existing or proposed dam;
- (6) An OMRF prepared as specified in Env-Wr 303.04;
- (7) The engineer's resume as required by Env-Wr 403.03;
- (8) The results of any subsurface explorations;
- (9) The results of any structural analyses, which may include but not be limited to, stability analyses for overturning, sliding, and slope failure;
- (10) The results of hydrologic, hydraulic, and stability calculations, which show that the dam has the capacity to safely discharge the design storm with 1 foot freeboard without manual operations or is safe for overtopping;
- (11) A document that proves ownership of flowed land or flowage rights pursuant to Env-Wr 402.02(a)(1);
- (12) The results of a seepage analysis for significant and high hazard dams, if applicable;
- (13) An EAP for significant and high hazard dams, if applicable; and
- (14) Construction plans and specifications.
(b) The owner shall include the following with the application:
- (1) The fee required by RSA 482:9, II;
- (2) Preliminary plans, specifications and other documentation related to the construction or reconstruction; and
- (3) Deeds, easements, rights, or agreements associated with the dam and the property on which the dam is located, if applicable.
- (c) The property owner(s) and dam owner(s), if different, shall sign the application to certify that the information provided is true and complete to the knowledge and belief of the signatory(ies).
- (d) Incomplete or improperly completed forms shall be returned by the department to the applicant or applicants with a statement for the reason(s) for the return and the additional information required.
Source. #1716, eff 2-20-81; ss by #2207, eff 12-13-82; ss by #2900, eff 11-7-84, EXPIRED 11-7-90 New. #5080, eff 2-22-91; ss by #6462-B, eff 2-21-97; ss by #8285, INTERIM, eff 2-21-05, EXPIRES: 8-20-05; ss by #8414, eff 8-20-05; ss by #10510, eff 1-22-14; ss by #13980, eff 5-24-24