- (a) Upon approval or conditional approval of the technology assessment report, or pursuant to Env-Wq 717.05(d), the owner shall submit a basis of design in accordance with Env-Wq 707 for the proposed project.
- (b) The department shall respond to the basis of design within 60 days.
- (c) The department shall accept the proposed basis of design if the proposed basis of design appears to provide treatment that will be adequate to satisfy the requirements of the discharge permit.
- (d) Acceptance of the basis of design shall constitute authorization to proceed with final design for the proposed I/A technology project.
Source. #10693, eff 10-15-14; ss by #14258, eff 7-1-25, EXPIRES: 7-1-35