(a) A pilot test plan shall include:
(1) A description of proposed pilot unit equipment description and capacity, either as:
- a. Existing treatment units parallel to the existing treatment process; or
- b. A stand-alone pilot;
(2) A proposed schedule and duration, including:
a. A calendar schedule with considerations for:
- 1. Seasonal temperature variations relative to impact on process performance;
- 2. Seasonal flow variations; and
- 3. Seasonal waste characterization variations; and
- b. Pilot duration and justification for proposed duration to account for seasonal variations;
(3) Wastewater feed characterization, including:
- a. Historical WWTP flow and waste characteristic data review;
- b. Proposed program for pilot wastewater characterization;
- c. Wastewater sampling and analysis plan; and
- d. Pretreatment requirements for the pilot equipment, if necessary;
(4) Proposed pilot equipment configuration and set up, including:
- a. Pilot feed equipment and feed rate;
- b. Pilot unit description and proposed location on WWTP site;
- c. Flow measurement during pilot testing;
- d. Pilot control methodology;
- e. Sample collection and analysis plan during pilot testing; and
- f. Proposed modifications to the existing facility, if required;
(5) Pilot start up plan, including:
- a. Written description of pilot start up plan;
- b. Startup monitoring and supervision; and
- c. Proposed process stabilization determination methodology; and
(6) Field procedures and monitoring, including:
- a. List of parameters to be monitored;
- b. Sampling frequency and analysis for each parameter;
- c. Type of sampling, grab, or flow-proportional composite;
- d. Sample handling procedures used to assure quality assurance; and
- e. Procedures to address unusual events such as process upsets and equipment failures.
- (b) A pilot test summary report shall be completed and submitted for review, if needed pursuant to Env-Wq 717.05 and Env-Wq 717.06, and approval in accordance with Env-Wq 717.06(b), by the department within 60 days of pilot test conclusion and prior to designing or constructing a full-scale system.
(c) The pilot test summary report shall include, at a minimum:
- (1) Executive summary;
- (2) Pilot methodology;
- (3) Sampling and analysis methodologies;
- (4) Test procedures and methods;
- (5) Complete data summary;
- (6) Data analysis methodology;
- (7) Analysis of pilot performance; and
- (8) Conclusions and recommendations.
Source. #10693, eff 10-15-14; ss by #14258, eff 7-1-25, EXPIRES: 7-1-35