The basis of design report shall include a recommended treatment technology and a description or analysis of:
- (a) The selected treatment technology, explaining justification for making the selection over other available treatment technology options;
- (b) Design criteria summary;
- (c) Site layout and hydraulics profile;
- (d) Treatment process schematics;
- (e) Cost summary;
- (f) For a proposed modification or addition to an existing WWTP, a construction sequence for maintaining WWTP operations and permit compliance during construction and testing; and
- (g) An overall project schedule from design through completion of construction that also includes the meetings between the owner, design engineer, and department review staff required by Env-Wq 707.08 and any additional meetings considered necessary by the owner and design engineer.
Source. (See Revision Note at chapter heading for Env-Wq 700) #8590, eff 3-25-06; ss by #10693, eff 10-15-14; ss by #14258, eff 7-1-25, EXPIRES: 7-1-35