- (a) Complete technical specifications and supporting documentation for the construction of sewerage and WWTPs shall accompany the design drawings submitted pursuant to Env-Wq 703.01.
(b) The technical specifications shall describe the following information as applicable to the proposed project:
- (1) All construction information not shown on the drawings that is necessary to inform the contractor of the design requirements and the quality of materials, workmanship, and fabrication of the project;
- (2) The type, size, operating characteristics, and rating requirements of all mechanical and electrical equipment;
- (3) Laboratory fixtures and equipment;
- (4) Operating tools;
- (5) Pipe and other construction materials;
- (6) Special filter materials;
- (7) Sewer appurtenances;
- (8) Chemicals that will be used as part of the wastewater treatment process;
- (9) Instructions for testing materials and equipment as necessary to meet design standards; and
- (10) Performance tests for the completed works and component units.
(c) The supporting documentation shall include:
(1) For all projects:
- a. Soil investigations, borings, and geotechnical reports;
- b. Flotation calculations for buried structures; and
- c. Design flood elevations determined in accordance with Env-Wq 706.03; and
(2) For sewerage and sewage pump station projects, design calculations for:
- a. Determination of the average daily flow, peak hourly flow, and infiltration allowance;
- b. Flow velocities and depths within gravity sewers and channels;
- c. System head curves for force mains and pump capacity curves for all anticipated pump station operating conditions; and
- d. Pump cycle times, wet well volume requirements, and sewage retention times of wet wells and force mains.
Source. (See Revision Note at chapter heading for Env-Wq 700) #8590, eff 3-25-06; ss by #10693, eff 10-15-14; ss by #14258, eff 7-1-25, EXPIRES: 7-1-35