(a) The procedures specified in (c) through (h), below, shall apply to any of the following potential permit modifications:
- (1) An increase in production monitoring;
- (2) An increase in monitoring and reporting of ground water or surface water levels;
- (3) A reduction in permitted withdrawal volumes;
- (4) The implementation of an impact mitigation program;
- (5) A change in the name or ownership of the permittee; or
- (6) Any other change that has no potential to create adverse impacts.
- (b) The permit modification procedures specified in (c) through (h), below, shall not apply to any requested permanent increase in the withdrawal rate or volume. A permittee seeking a permanent increase in the withdrawal rate or volume shall apply for a new large groundwater withdrawal permit pursuant to Env-Wq 403.05.
- (c) A permittee seeking a modification as specified in (a), above, to a large groundwater withdrawal permit shall submit a written request to the department to modify the permit.
(d) The request submitted pursuant to (c), above, shall explain in detail the following:
- (1) The specific modification requested;
- (2) The reason(s) for the requested modification; and
- (3) How the permit as modified complies with the criteria for issuance of a permit specified in Env-Wq 403.21.
- (e) The department shall modify a permit in response to a request from the permittee only if it determines that the modified permit complies with the criteria for issuance of a permit specified in Env-Wq 403.21.
- (f) A permit modification request that proposes a change in purpose or use of the withdrawal shall require the submittal of an application for a new permit in accordance with Env-Wq 403.05.
- (g) If the department determines that a permit modification is needed to eliminate or prevent adverse impacts, the department shall initiate a proceeding in accordance with RSA 541-A:30, II, RSA 541-A:31, and the provisions of Env-C 200 relative to adjudicative proceedings.
(h) The written notice provided to the permittee pursuant to RSA 541-A:31 shall:
- (1) Identify the facility by name, location, and permit number;
- (2) Explain the modification(s) the department proposes to take and the reasons for the proposed modification(s);
- (3) Identify the department’s authority for taking such action; and
- (4) Identify, by name, title, mailing address, and telephone number, the department representative who may be contacted regarding the notice.
- (i) As specified in RSA 485-C:21, V-d, the grounds for permit modification shall include that changes are needed to accommodate drought conditions or new withdrawals.
Source. (See Revision Note #1 at part heading for Env-Wq 403) #9569, eff 10-17-09; ss by #12493, eff 3-21-18 (formerly Env-Wq 403.31) (See Revision Note #2 at part heading for Env-Wq 403)