(a) These rules shall apply to:
- (1) The development of a new source of groundwater that constitutes a large groundwater withdrawal;
- (2) The renewal of an existing large groundwater withdrawal permit;
- (3) The development of a replacement well for an existing large groundwater withdrawal; and
- (4) The new extraction or drainage of groundwater from a shaft or hole in the earth that equals or exceeds 57,600 gallons in any 24-hour period.
- (b) These rules shall not apply to the removal or diversion of water that is not groundwater from an excavation.
Source. (See Revision Note #1 at part heading for Env-Wq 403) #9569, eff 10-17-09; ss by #12493, eff 3-21-18 (See Revision Note #2 at part heading for Env-Wq 403)