To be processed as provided in Env-Wq 2303.06(a), the applicant shall provide the following information to the department:
- (a) The organization name and the town or city in which it is located;
- (b) The name, title, email address, affiliation, street address, city, state, zipcode, and daytime telephone number of the applicant’s point of contact for the application;
- (c) The project title;
- (d) The authorized representative name, title, and affiliation;
- (e) The towns or cities in which the project is located;
- (f) The waterbody affected by the project;
- (g) A project location map showing the watershed of the waterbody and relevant project site locations;
- (h) A concise description of the proposed project and of the need for the proposed project, including how it will address cyanobacteria, together with a brief description of the alternatives that have been considered and a demonstration of how the eligibility requirements of Env-Wq 2303.01 and Env-Wq 2303.02 are met;
- (i) A statement relative to the transmittal of the application to the department dated and signed by the applicant’s authorized representative with their name and title printed;
- (j) A description of how the project implements actions from the watershed management plan;
- (k) A description of how the project is or was necessary to reduce nutrient loading identified in the watershed management plan, as specified in RSA 485-A:59, I(c)(1);
- (l) A summary of the existing conditions;
- (m) The basis of design for the project, which may include but is not limited to flows, dosing, and construction plans, and the necessary information to develop the most current cost estimate, as described in Env-Wq 2303.04(n);
- (n) The most current estimate of the total project costs itemized and including an explanation of the basis of the cost estimates and a statement of all assumptions made in developing the cost estimate;
- (o) The date the applicant received governing body approval to borrow funds for the project or the date the applicant anticipates receiving such approval;
- (p) The anticipated date that the project will start and be completed;
- (q) A project schedule with a list and descriptions of project milestones and target dates to achieve each milestone;
- (r) The source of other funding contributing to the project, if any, and for each source the amount and status of the funding;
- (s) A summary of the nutrient load reduction actions and estimated nutrient load reductions completed at the time of the application;
- (t) A description of the participation and commitments to reducing external nutrient loads expected and on-going from stakeholders, landowners, other agencies, organizations, and municipalities, as applicable;
- (u) A list including a timeline of the external nutrient load reduction actions identified in the watershed management plan that will be completed and the estimated nutrient load reductions for each action, including the project;
- (v) The amount of loan or grant requested; and
- (w) The loan term requested, which shall be 5, 10, 15, or 20 years, provided the loan term shall not exceed the design life of the project for which the loan is being requested.
Source. #13858, INTERIM, eff 1-27-24, EXPIRED: 7-25-24 New. #14078, eff 9-24-24