Each application shall be scored on the project’s consistency with the needs identified in federal, state, regional, or local plans or studies as follows:
- (a) A project need that is specifically identified by one or more federal, state, regional, or local plans or studies shall receive 3 points;
- (b) A project need that is generally supported in concept by 2 or more federal, state, regional, or local plans or studies shall receive 2 points;
- (c) A project need that is generally supported in concept by one federal, state, regional, or local plan or study shall receive one point; and
- (d) A project that has no documented need shall receive no points.
Source. #9570, eff 10-17-09