The following blast hole loading practices shall be implemented:
(a) The driller shall maintain drilling logs to document:
- (1) The depths and lengths of voids, cavities, and fault zones or other weak zones encountered; and
- (2) Groundwater conditions;
- (b) The driller shall communicate the contents of the drilling logs directly to the blaster;
(c) Explosive products shall be managed on site such that they are:
- (1) Used in the borehole;
- (2) Returned to the delivery vehicle; or
- (3) Placed in secure containers for off‐site disposal;
(d) Spillage around the borehole shall be:
- (1) Placed in the borehole; or
- (2) Cleaned up and returned to an appropriate vehicle for handling or placement in secured containers for off site disposal;
- (e) Loaded explosives shall be detonated as soon as possible and not left in the blast holes overnight, unless weather or other safety concerns reasonably dictate that detonation should be postponed;
- (f) Loading equipment shall be cleaned in an area where wastewater can be properly contained and handled in a manner that prevents release of contaminants to the environment; and
- (g) Explosives shall be loaded in accordance with industry standard practices for priming, stemming, decking and column rise to maintain good continuity in the column load to promote complete detonation.
Source. #12342, eff 8-15-17; ss by #14472, eff 1-19-26, EXPIRES: 1-19-36