- (a) All impacts related to construction shall be completely contained within the area of disturbance allowed by RSA 483-B:9, V(b)(2)(A) as appropriate given the area of the lot within the natural woodland buffer.
(b) Within 3 days of final grading or temporary suspension of work in an area that is in the protected shoreland, all exposed soil areas shall be stabilized by:
- (1) Seeding and mulching, if during the growing season;
- (2) If not within the growing season, by mulching with tack or netting; or
- (3) With an alternative method of temporary stabilization as specified in Env-Wq 1500.
- (c) A maximum of 150 square feet of retaining wall may be excluded from the calculation of impervious area, provided the wall has a footprint of 12 inches or less in width.
Source. (See Revision Notes #1 and #2 at chapter heading for Env-Wq 1400) #12062 eff 12-17-16