(a) The buyer shall also hire a permitted designer to determine, prior to the transfer of the property, if the septic system is in failure and if:
- (1) The existing septic system does not have approval to operate from the department; or
- (2) The existing approval to operate from the department was issued prior to September 1, 1989.
- (b) If the permitted designer in (a), above, determines that the septic system is in failure in accordance with RSA 485-A:2, IV, the buyer and the evaluator shall comply with the requirements in RSA 485-A:39, V.
- (c) If the septic system evaluator hired pursuant to Env-Wq 1025.01(a)(1) or (2) determines that the septic system shows signs of failure, the buyer and the evaluator shall comply with the requirements in RSA 485-A:39, V.
- (d) If the evaluator is required to provide notification to the department pursuant to RSA 485-A:39, V, the evaluator shall complete and submit the form “Septic System Evaluation Report for Waterfront Property Transfer”, NHDES-W-05-015, February 2026, available at https://onlineforms.nh.gov/?formtag=NHDES-W-05-015.
Source. #14486, eff 2-1-26, EXPIRES: 2-1-36