- (a) The permitted designer shall inspect the basal area preparation prior to fill placement, and shall submit an inspection report to the department’s regional inspector at the time of final inspection.
- (b) Compaction and smearing of infiltrative surface shall be avoided during fill placement and site preparation.
- (c) The installer shall maintain 8 to 12 inches of fill between equipment tracks and the prepared surface.
Source. (See Revision Notes #1 and #2 at chapter heading for Env-Wq 1000) #11184, eff 10-1-16; ss by #14486, eff 2-1-26, EXPIRES: 2-1-36