Any person excavating for an EDA shall:
- (a) Protect the natural absorption qualities of the soil;
- (b) Protect open excavation from storm runoff to prevent the entrance of silt and debris;
- (c) Rake all smeared or compacted surfaces to a depth of one inch; and
- (d) Remove loose material before the fill or uniform crushed stone is placed or, in the case of chambers or LDGP systems, the sand layer is constructed.
Source. (See Revision Notes #1 and #2 at chapter heading for Env-Wq 1000) #11184, eff 10-1-16; ss by #14486, eff 2-1-26, EXPIRES: 2-1-36 (formerly Env-Wq 1016.03)