- (a) The pump chamber shall be water-tight and vented.
- (b) Venting shall be done directly or through the septic tank.
- (c) The capacity of the pump chamber shall be such that the pump or siphon can be set to dose each bed a minimum of 3 times per day.
- (d) If duplicate pumps are not provided, the dosing chamber shall be equipped with a high water alarm that signals in a centrally-located area at the building served if the pump fails for any reason.
- (e) Each pump chamber shall be accessible via a riser and cover that meet the requirements of Env-Wq 1010.05.
- (f) A duplex pump chamber shall be accessible via a riser with an access hatch. The permitted designer shall specify the load-bearing requirements for the access hatch.
Source. (See Revision Notes #1 and #2 at chapter heading for Env-Wq 1000) #11184, eff 10-1-16; ss by #14486, eff 2-1-26, EXPIRES: 2-1-36