In addition to the plan requirements for an ISDS application established in Env-Wq 1003.13, the applicant designing an ISDS for a ledge lot shall:
- (a) Specify the type of fill to be used to raise the bed to the appropriate elevation;
- (b) Specify the method of stabilization of the fill, including compaction method, layering, wetting, and stabilization period;
- (c) Supply test pit information to verify the nature of the receiving layer, both at the EDA and down-slope from the proposed EDA, as specified in Env-Wq 1006.04;
- (d) Show on the plan all bedrock exposures within 75 feet of the proposed EDA; and
- (e) Show on the plan all surface waters and drinking water supplies within 75 feet of the components of the proposed ISDS.
Source. (See Revision Notes #1 and #2 at chapter heading for Env-Wq 1000) #11184, eff 10-1-16; ss by #14486, eff 2-1-26, EXPIRES: 2-1-36