- (a) Not less than 30 days or more than 120 days prior to filing an application for a standard permit, research and development permit, or Type I-A permit modification, the applicant shall attend a pre-application meeting with the department to discuss the proposed facility, proposed project, or proposed facility changes.
(b) The applicant shall provide the following information about the proposed facility, proposed project, or proposed changes at or prior to the meeting:
- (1) Name of the applicant, facility owner, property owner, and facility operator;
- (2) Location of the proposed or existing facility or project, including a site plan showing proposed setback distances;
- (3) Functional classification pursuant to Env-Sw 302.05;
- (4) Service area and service type;
- (5) Types and quantities of wastes;
- (6) For landfills, footprint, design volume, and life expectancy;
- (7) A description of the proposed facility, proposed project, or proposed changes, including a process flow diagram as applicable;
- (8) A synopsis of hydrogeologic, geologic, and soils information that the applicant has researched and intends to use to support its application;
- (9) Anticipated schedule for permitting, construction, and operations; and
- (10) Other information as needed to inform the department of the proposed facility, proposed project, or proposed changes.
Source. #14124, eff 11-23-24, EXPIRES: 11-23-34 (see Revision Note #2 at chapter heading for Env-Sw 300)