- (a) Acceptance of the permit by the applicant shall constitute permission for the department to enter the permitted facility for the purpose of collecting information, examining records, collecting samples, and taking other actions needed to ensure compliance with the permit.
(b) Prior to commencing operations, the permittee shall submit to the department:
- (1) An as-built site plan on an 8-1/2 inch x 11 inch or 11 inch x 17 inch sheet, together with boring logs and well construction details; and
- (2) The results of 2 complete rounds of water quality testing collected at least 2 weeks apart.
Source. #8812, eff 2-1-07; ss by #10832, eff 6-1-15 (from Env-Or 703.09); ss by #14420, eff 11-4-25, EXPIRES: 11-4-35 (formerly Env-Or 703.11)