- (a) The responsible party required to conduct a site investigation under Env-Or 606.01 shall prepare a remedial action plan unless exempted under Env-Or 606.11.
- (b) The responsible party shall submit a report of the remedial action plan required in (a), above, to the department within 120 days following written notice from the department that a remedial action plan is required under (a), above.
- (c) The remedial action plan report shall be dated, signed, and sealed by the engineer of record.
(d) The remedial action plan shall:
- (1) Provide for protection of human health and the environment;
- (2) Provide a detailed evaluation of remedial alternatives pursuant to Env-Or 606.12(c) with justification for the recommended alternative;
(3) Recommend action to:
- a. Remove or treat the source of contamination;
- b. Contain the contamination source to limit the impact to groundwater, surface water, and soil to the extent feasible;
- c. Protect human health from exposure through the indoor air exposure pathway;
- d. Protect human health from exposure through the direct contact exposure pathway;
- e. Contain contaminated groundwater within the limits of a proposed groundwater management zone, delineated in accordance with Env-Or 607.05;
- f. Restore groundwater quality to the groundwater quality criteria specified in Env-Or 603.01; and
- g. Restore soil quality to the soil remediation criteria specified in Env-Or 606.19; and
- (4) Provide for financial assurance pursuant to Env-Or 606.20 and Env-Or 606.21, as applicable.
Source. (See Revision Note at chapter heading for Env-Or 600) #8812, eff 2-1-07; ss by #10831, eff 6-1-15; ss by #14419, eff 11-4-25, EXPIRES: 11-4-35