- (a) If the through put of a gasoline dispensing facility that had not previously met the criteria of Env- Or 501.02(b) becomes equal to or greater than 10,000 gallons of gasoline per rolling 30-day period, the owner or operator shall comply with all applicable requirements of this chapter within 180 days after the date the facility becomes subject to this part.
- (b) The owner or operator of a gasoline dispensing facility that begins operation after the effective date of this chapter and that meets the criteria of Env-Or 501.02(b) shall comply with all applicable requirements of this chapter upon commencement of operation.
- (c) The owner or operator of a gasoline dispensing facility that already is subject to stage I requirements and that undergoes substantial modifications to any tank or piping shall comply with all applicable requirements of this chapter as to the complete stage I system, including all modified components, upon completion of the modifications.
- (d) If the monthly throughput of a gasoline dispensing facility is 100,000 gallons of gasoline per month or more as of the effective date of this chapter, the owner or operator shall comply with Env-Or 504.06(a)(1) within 180 days of the 2022 effective date of this chapter.
(e) If the monthly throughput of a gasoline dispensing facility increases to 100,000 gallons of gasoline per month or more subsequent to the 2022 effective date of this chapter, then:
- (1) The owner or operator shall comply with Env-Or 504.06(a)(1) within 180 days of the throughput becoming equal to or greater than 100,000 gallons of gasoline per month; and
- (2) The facility shall continue to be subject to Env-Or 504.06(a)(1) even if a reduction in throughput occurs to below the specified threshold.
Source. (See Revision Note #1 and Revision Note #2 at chapter heading for Env-Or 500) #10229, eff 11-17-12; ss by #13458, eff 10-7-23 (formerly Env-Or 504.11)